Swabbing John's Inc.
PO Box 458
or Hwy 76 North
Lindsay, OK  73052
Office:(405)756-8141
Fax:(405)756-8916
Email:  info@swabbingjohnsinc.com


   
 

HomeOur HistoryMeet UsContact Us

   

 

Home

Our History

Meet Us

Contact Us

Employee Login

Corporate Login

 

Welcome to
Swabbing Johns Inc.

  What is swabbing? 

  Swabbing alleviates hydrostatic pressure of a wellbore caused by fluid level and weight of hydrocarbons in a string
  of tubing in a completed well. 

  Swabbing is to reduce wellbore pressure, by physically pulling fluid out of the production string.  When wellbore pressure
  is reduced, this creates a kick, from the reservoir out to the wellbore, which allows reservoir pressure, fluids, and solids
  etc., a path of lesser resistance.  Ridding this reservoir of these gas blocking materials increases your potential for optimizing
  gas and oil and water production.  A clean wellbore provides bigger more powerful casing breaks, significantly increasing
  hydrocarbon lifting power.  This lowers lifting costs.  Deposits are created by fluid moving in and out of wellbore perforations,
  and over time if neglected, can cause a total loss of flow pressure differential.  When this takes place, build up of these
  materials reduce total area of open perforations to flow thru. As a result, a loss of production occurs. Total area of open   
  perforations and amount of solid inhibitors, such as scale, jip, sand, salt, etc. can be controlled by fluid recovery analysis,
  sample testing, chemical treatments, and swabbing these treatments back in a timely order. To reduce the chance for further
  zone damages, and eliminate the costs of pulling tubing, chemical treatment can be pumped down and swabbed back in 24
  hours to successfully flush and clean seating nipple and break around point. This allows reservoir fluids to flow into well bore
  and up the production string, without having to prematurely install expensive external lifting devices, such as pumping units,
  to provide for a longer well life.

             We provide the following services:

·         Swabbing

·         Flowing

·         Broaching

·         Cutting paraffin

·         Setting collar stops

·         Fishing downhole equipment

·         Determining well depth

·         Flow methodology

 

We provide consultation for the following:

·         Troubleshooting well problems

·         Wellhead and flowline design

·         Chemical treatment/sample analysis

·         Plunger system design and setup

  Swabbing John’s employees strive to provide quality, educated, and safe services to all customers.   Every operator must
  show considerable aptitude, and an extreme willingness to safely complete his job in a timely matter.  Swabbing John's
  employees attend a monthly safety meeting provided by safety coordinator, Preston Keck.  Swabbing John’s
  employees are provided with family insurance, optional dental insurance, life insurance, Simple IRA, paid vacation, cellular
  communication, uniforms and all safety equipment. 

  Swabbing John’s has eight swabbing units that were built and are maintained by Crown Energy Technologies, Div of Stewart
  and Stevenson, and National Oilwell Varco.  Rig Motors and transmissions are built and maintained by United Engines.  Rig
  Operators are responsible for the regular maintenance and troubleshooting of rig operating systems and upkeep of
  maintenance logs.  All of our swabbing units are vigorously maintained with top of the line materials and equipment
  so our operators can provide safe and quality work with minimal breakdowns.  Contact a tool pusher for any information.


 

 
   

Swabbing John's Inc.
PO Box 458
or Hwy 76 North
Lindsay, OK  73052
Office:(405)756-8141   Fax:(405)756-8916
Email:  info@swabbingjohnsinc.com

   

This site has been built and is maintained by Real Deal Creations.
Please contact Jeanie Deal at Real Deal Creations if you experience any problems with this website.